Prev Next
Mission, Values and Vision

The corporate vision is the basis of our business strategy, direct our activities and guide our people.

Read more
Mission, Values and Vision
Heart & Soul into observing to grow

Moved by an inquiring spirit, by the curiosity for discovering and our passion for innovation

Culture of innovation
Heart & Soul into observing to grow
Heart & Soul into improving every day

We have over 2,500 professionals working on new technological challenges each day.

Heart & Soul into improving every day
Heart and Soul into our social commitment

We offer solutions that contribute to improving quality of life and society's progress.

Sense of responsibility
Heart and Soul into our social commitment
Heart & Soul in every corner of the world

With projects on 5 continents.

projects
Heart & Soul in every corner of the world

Engineering and Construction

Aerospace

Aerospace sener-at-meteosat-third-generation

With fifty years of success in the aerospace industry under its... belt, SENER provides equipment, systems integration and engineering services for projects in the areas of Space, Defense, Aeronautics, and Vehicles, and is the main contractor for complete programs. [+]

Infrastructures and Transport

Infrastructures and Transport Linea de Alta Velocidad Madrid-Levante Viaducto del Itsmo

SENER provides sustainable and innovative solutions in the area of ... Infrastructures and Transport and is a key player in the implementation of important works in countries such as Algeria, Argentina, Brazil, Colombia, Chile, Spain, the USA, Mexico, and the UK. [+]

Power, Oil & Gas

Power, Oil & Gas sener-thermosolar-plant-noor1

SENER is an expert in Power, Oil & Gas high technology projects and... specializes in turnkey projects, which encompass engineering, purchasing, and the construction and commissioning of the facility, as well as offering operation and maintenance services. [+]

Marine

Marine Queen Elisabeth

SENER was founded in 1956 as a marine technical office and today... carries out ship engineering projects and markets its own CAD/CAM/CAE in the shape of the FORAN System. More than 1000 ships, in shipyards all around the world, have been built using SENER’s designs. [+]

Highlighted projects

See all
Infrastructures and Transport Hamad Port in Qatar

Independent review of design of systems for the new port in Qatar. In 2007 the Government of Qatar, via the ... New Port Project (NPP) Company, undertook a program of investment to develop a port in the south of the country (Mesaieed), the Hamad Port, which will be able to accommodate the future growth of container, vehicle and goods traffic, in general.[+]

Aerospace Euclid Mechanical Ground Support Equipment (MGSE)

The Euclid mission aims at understanding why the expansion of the Universe is accelerating and what is the nature ...of the source responsible for this acceleration which physicists refer to as "dark energy". The mission will investigate the distance-redshift relationship and the evolution of cosmic structures by measuring shapes and redshifts of galaxies and clusters of galaxies out to redshifts ~2, or equivalently to a look-back time of 10 billion years. Thales Alenia Space,[+]

Power, Oil & Gas Central receiver plant NOORo III

Download NOORo III fact sheet Central receiver plant NOORo III, Ouarzazate, Morocco. Following NOORo I, SENER is now beginning the works on NOORo ...II, which is rated at 200 MWe and has molten salts storage capacity, and in which SENER’s second generation of parabolic troughs – the SENERtrough®-2 system – are being installed, as they are in NOORo III, rated at 150 MWe. Access to the microsite In contrast to the others, this plant will have a central tower with heliostats and a salt receiver,[+]

Marine Multipurpose Subsea Support Vessel

Multipurpose Subsea Support Vessel. Project description: Shipyard: R&D Project. Owner: R&D Project Contract type: Engineering Services. Location: Madrid (Spain). Scope: Conceptual Engineering. Basic Engineering: SENER. Others: 112 m length, ...22 m breadth, 7 m draught, Diesel electric propulsion, 40MT crane, option 250MT Crane, working depth 4 m, Moonpool, Helideck, 110 persons, optional 600 T Cable Carousel, two tunnel thrusters one retractable bow thruster. [+]

Current news

See all

Next events

See all

From 22/02/2018 To 23/02/2018 José María Menéndez, from People Management, will participate in this forum in the School of Engineers from... [+]

Prev Next
  • UNE EN ISO 9001
  • UNE EN ISO 14001
  • OHSAS 18001
  • UNE EN 9100
  • UNE EN ISO 13485
  • UNE 166002
  • IQNet
Share
Share:
Contact Up Up