Guadalajara metro, Mexico - line 3

Image Gallery

Prev Next
SENER Infraestructuras y transporte Metro de Guadalajara SENER Infraestructuras y transporte Metro de Guadalajara
SENER Infraestructuras y transporte Metro de Guadalajara
SENER Infraestructuras y transporte Metro de Guadalajara
  • Client: Secretaría de Comunicaciones y Transportes (SCT)
  • Country: Mexico
  • Start date: 2012
  • Ending date: 2013
Download datasheet

SENER carried out the project for the new Guadalajara Metro Line 3 in its entirety, from the Pre-Feasibility Study stage to the Detailed Design stage.

Line 3 has a length of 13,1 miles, being 1,5 miles in surface, 9,5 miles in viaduct and 2,8 miles underground. It has 18 stations, two on surface, three underground and 13 on-air stations. Scope of services included pre-feasibility studies, preliminary and detailed design of Guadalajara Metro Line 3. Within the pre-feasibility studies it is included the mobility and demand studies, legal studies, environmental analysis, fi nancial and socio-economic studies.

In the stages of preliminary and detailed design SENER has carried out the following services: Alignment, Stations architecture and implementation, Stations structure, Electromechanical installations in stations, Tunnel structural design (TBM project), Viaduct structural design, urban integration, track design, Signaling systems, Communication and control rail systems, Rolling stock, Rail operational model, financial model, workshops and depots and transport junction design.